Site Login ||
HWY 189 at Deer Creek Slope Stabalization
Emphasis: Geotechnical
Sponsor: URS
Description: A section of HWY 189 at the waterfront of Deer Creek reservoir is losing pavement to the lakeside slope because of erosion. This project involves road widening and a system for permanent slope stabalization. The project is complicated by the inability to close the road for any extended period as is it a major commute route.
Documents: