Error message

User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Construction Water Pond Relocation

Emphasis: Geotechnical

Sponsor: Rio Tinto

Description: Rio Tinto currently uses a large construction water pond for their on-going projects, but it needs to be moved. The project includes site/location evaluation, logistical plans for continued and efficient use by contractors/machinery, pond design, water input/output systems, etc. The pond holds about an acre-ft of water. See 2 photos for examples.

Documents:

RFP

Final Report

Poster

Presentation - Not Available