Error message

User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Intersection Design for Trax

Emphasis: Transportation

Sponsor: Rio Tinto

Description: There is a  need for an intersection at the North Trax Station near South Jordan Parkway, Grandville Ave, and Mountain View Corridor. The intersection should connect Mountain View Corridor to South Jordan Parkway by crossing Grandville Avenue and the Trax line (Trax runs along Grandville). The design would be primarily focused on the spacial orientation of the intersections, especially in their interaction with the Trax lines. Considerations include interaction with rail, the Trax station and trains, traffic control, signal type and placement, construction conflict, (the Trax line cannot be shut down), utility lines, etc. May be some interaction with UTA.

Documents:

RFP

Final Report

Poster

Presentation - Not Available