User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

HWY 189 at Deer Creek Slope Stabalization

Emphasis: Geotechnical

Sponsor: URS

Description: A section of HWY 189 at the waterfront of Deer Creek reservoir is losing pavement to the lakeside slope because of erosion.  This project involves road widening and a system for permanent slope stabalization. The project is complicated by the inability to close the road for any extended period as is it a major commute route. 

Documents:

RFP

Final Report

Poster

Presentation