User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Daybreak Parkway Re-Alignment and Restriping

Emphasis: Transportation

Sponsor: Kennecott Land

Description: This project involves a new roadway alignment that comes from the south through Herriman City and connects to Daybreak Parkway in South Jordan City.  It crosses Kennecott property and the goal is to minimize the impact of the right of way on our property to maximize the developable area. The design team will develop concepts for the different intersection configurations as well as some preliminary design work for signal layouts. The design will propose different strategies for turning movements, signing and striping, signal options for the intersection and how to get pedestrians through the area safely, ie crosswalks, ADA ramps, etc. utility relocation.  Cost estimates and engineer’s estimates for the work to also be completed.  

Documents:

RFP

Poster

Report