Error message

User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Springville Canyon Road

Changing two "tee" intersections into two 4-way intersections with a new connecting roadway between the two new intersections

  • Roadway design will involve horizontal and vertical curves, a cul-de-sac, and placement of footings and conduit for a future traffic signal at one of the two intersections.
  • Design of storm water collection, transmission and detention facilities
  • Relocation of existing irrigation water facilities
  • Sidewalks and ADA ramps at intersection corners will also be required

RFP

Proposal

Interview

Poster

Presentation

Final Report