Error message

User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Camp Koholowo

The proposed project is to design a filtration and chlorination system that will provide 4-log removal, and install the equipment that will log the needed water quality data to report to the state, and which will help ensure that water quality requirements are being met.  The mainobstacles with the project is that the camp is on Forest Service Property leased to the Church and there is no electricity to the site.  The project team will likely need to design the system to run off of solar power.  A shelter may also need to be designed to provide shelter for the treatment equipment.

RFP

Proposal

Interview

Poster

Presentation

Final Report