Site Login ||
Springville Canyon Road
Changing two "tee" intersections into two 4-way intersections with a new connecting roadway between the two new intersections
- Roadway design will involve horizontal and vertical curves, a cul-de-sac, and placement of footings and conduit for a future traffic signal at one of the two intersections.
- Design of storm water collection, transmission and detention facilities
- Relocation of existing irrigation water facilities
- Sidewalks and ADA ramps at intersection corners will also be required