User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Bartholomew Culinary Tank

Replacement of the Bartholomew Culinary Water Tank in left-hand fork of Hobble Creek Canyon.

  • Will require the most efficient sizing based on the City's and the Canyon Water User's needs
  • Site Selection near existing tank
  • Type of tank (steel or concrete)
  • Design of the Emergency Overflow structure within the tank
  • Connection Piping to Spring Collection System (inflow) and transmission penstock (outflow).
  • Phasing sequence to decommission the old tank and connect the new tank to the spring collection system piping (inlet) and the 24” penstock (outlet) which feeds a hydroelectric generation station near Rotary Park.