User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Daybreak Bridge

We have two BEBO bridges that cross over to the island in the middle of our lake.  We have not completed the top of each bridge.  I was thinking it may be a good opportunity to do some structural design for the parapet walls/transportation barriers as well as some transportation/pavement design to determine the final construction of the road.  Also included in that would be signing and striping for the transitions into and out of the bridges.  While the two bridges are largely the same we there are some differences that would need to be accounted for.  It may even be possible for two different groups each to take a bridge and see what they come up with.

RFP

Proposal

Interview

Presentation

Final Report