Site Login ||
Cinnamon Creek Camp
Design simple filtration and chlorination systems for two separate springs at the Cinnamon Creek Camp in order to achieve 4-log inactivation of viruses, including the design of a protective structure and equipment to monitor and report turbidity, chlorine residual, pH, temperature, and volume of water treated on a daily basis, as required by the Utah Administrative Code.