Error message

User warning: The following module has moved within the file system: cas. In order to fix this, clear caches or put the module back in its original location. For more information, see the documentation page. in _drupal_trigger_error_with_delayed_logging() (line 1143 of /auto/grp7/cecapstone/www/includes/bootstrap.inc).

Provo Tabernacle Footing and Foundation Design - Rehak

RFP, Proposal, Project Management PlanHalf way Report, Report, Poster, Presentation

Description:

The Provo Tabernacle was destroyed by fire on December 17, 2010.  If the building were to be restored, the existing masonry walls and rubble footings would need to be structurally stabilized and upgraded. Include in the design an excavated basement.  It is your task to design a footing and basement wall combination that will support the future loads that the building might encounter.  Some design information will be provided by the Temple and Special Projects Department and Reavely Engineering.  There has been no announcement on the Church’s plans for the Tabernacle.  This is only a potential design alternative that will make a good design project.

Sponsor:      LDS Church Temple and Special Projects Department             
Contact:       Andy Kirby
Project Manager
(801) 240-4873
50 East North Temple, 10th Floor
Salt Lake City, UT  84150-6310
andykirby@ldschurch.org