Site Login ||
Snell Building and Law Parking Lot Flooding - Y-DABT
RFP, Proposal, Project Management Plan, 50% Status Report, Report, Poster, Presentation
Description:
Review the flood event and damage cause to the Snell building area. Analyze the collection and distribution system capacities and deficiencies. Prepare multiple solution alternatives with cost estimates, present to sponsor and design an improvement plan for the selected alternative. BYU Physical Facilities has aerial contour maps and utility maps to assist in the analysis.
Sponsor: BYU Physical Facilities Department
Contact: Paul Reese
University Civil Engineer
(801) 244-5552
240 Brewster Building BYU
Provo, Utah 84602
paul_reese@byu.edu