Site Login ||
Daybreak Couplet Traffic Plan - TWGS
RFP, Proposal, Project Management Plan, Halfway Report, Appendix, Report, Poster, Presentation
Description:
The Daybreak Parkway Couplet located at 4700 West and Daybreak Parkway in South Jordan, Utah needs to have a speed/warrant analysis performed. The couplet is comprised of two sections of the Daybreak Parkway arterial witha roundabout at each end. This is a plan that considers different calming measures which will maximize commercial access including parking, improve pedestrian safety, and meet agency standards.
Sponsor: Rio Tinto – Kennecott Land
Contact: Gary Langston
Director Community Development
(801) 204-2769
4700 Daybreak Parkway
South Jordan, UT 84095
gary.langston@riotinto.com